Miami International Air Traffic Control Tower
TJ&B Air conditioning and Electric was contracted by Federal Aviation Administration to upgrade the entire HVAC/Chiller system and all supporting disciplines. It involves the installation of temporary AC and then the removal of existing equipment, piping, and ductwork. Ductwork will be reconnected from the new air handlers to the existing duct systems. All fire dampers will be replaced with fire/smoke dampers. There will be a complete upgrade of the DDC control system. All electrical work is also included in our scope. New flex ducts, dampers, and GRDs are to be installed. All carpentry work for ceilings, soffits, and chases will be installed and finished. Excavation for piping and the chillers will require the demolition and concrete work to be completed. We will conduct all testing, balance, and commissioning of the systems.