San Antonio Air Traffic Control Tower
TJ&B Air conditioning and Electric was contracted by Federal Aviation Administration to upgrade the HVAC systems in the tower and base support building. We installed temporary AC throughout the entire facility to maintain a 100% working environment. The scope of work was the recovery of refrigerant and the replacement of all HVAC units, VAVs, ductwork and registers. This included added new electrical panels, breakers, and wiring. All VAVs and associated hot water piping were replaced. All exhaust fans were replaced throughout the building along with interlocking louvers. During a hazardous material survey, asbestos and mold were identified and we performed asbestos abatement and mold remediation. At the conclusion of the construction, we provided programming and training of the new DDC controls to include certified systems testing and balance.